Our Performance
Tianjin Metro Line 6 Phase II Project
Tianjin Metro Line 6 Phase II Automatic Fare Collection (AFC) system project is the first AFC system construction project independently completed by Tianjin local integrators, with core components achieving a high degree of localized R&D and production, relying on the company's advantageous products to achieve the interconnection of the old and new lines, and cooperating with the line network center to take the lead in realizing the interline preferential benefits for cross-line barrier-free changeover so as to promote it throughout the entire Tianjin Metro area. The overall scale of the project is 55 million yuan, the total length of the line is 14.34 kilometers, including 9 stations and 9 intervals.
Tianjin Metro Line 10 Phase I Automatic Ticketing System Project adopts our self-developed non-contact IC card charging system, supports the use of cell phone QR code, NFC, and face recognition technology, and at the same time, adopts the way of transmitting information, connects directly with the intelligent payment platform, and supports remote operation and hierarchical processing of ticket processing terminals. The construction scale of this project is about 95 million yuan, the total length of the line is 21.22 kilometers, and there are 21 stations.
Nanhu Laboratory Project in Jiaxing
Nanhu Laboratory is a key technological innovation platform initiated by Jiaxing City in response to the national strategy of innovation-driven development and the integrated regional development strategy of the Yangtze River Delta. Constructed according to the FDA and EU standards, this project primarily involves ventilation, electrics, clean decoration, and automatic control engineering. It covers a building area of 9,847 square meters with a clean area of 6,500 square meters.
Phase II Renovation Project of Beijing Hanmi Laboratory
Beijing Hanmi Pharmaceuticals Co., Ltd. is the first modern pharmaceutical enterprise invested by South Korea in China. This project, located in Shunyi District, Beijing, primarily involves clean decoration engineering in the laboratory area, and covers a building area of 2,000 square meters.
Lithium Battery Separator Project of Hefei Senior
This project involves the construction of a high-performance ultrasonic lithium battery separator production plant with an annual output of 36 million square meters. It mainly includes electrical, piping, interior decoration, and ventilation system engineering. In the total building area of 35,265 square meters, the clean area covers 11,000 square meters.
Anti-cancer Drug Production and R&D Workshop Upgrade and Renovation Project of Qingdao Genova
This project involves the upgrade and renovation of the production workshop, representing as Genova’s first industrialized project for the clinical research of Novaferon, a treatment for chronic hepatitis B and malignant tumors. The clean area covers 5,000 square meters.