High-tech Factory Buildings
Anti-cancer Drug Production and R&D Workshop Upgrade and Renovation Project of Qingdao Genova
This project involves the upgrade and renovation of the production workshop, representing as Genova’s first industrialized project for the clinical research of Novaferon, a treatment for chronic hepatitis B and malignant tumors. The clean area covers 5,000 square meters.
Located in Beichen District, Tianjin and covering a building area of 6,000 square meters, this project includes on-site decoration, and installation of various disciplines including piping, electrics, HVAC, automatic control, and process equipment distribution and commissioning.
Phase II Electromechanical Installation Project of Sinovac Xiangrui Plant
Sinovac is the first Chinese vaccine company listed in the United States. Located in Daxing Biomedicine Industrial Base, Beijing, this project primarily involves electromechanical and purification installation engineering. In the total building area of 4,795 square meters, the clean area spans 2,000 square meters.
Laboratory Project of Tianjin Institute of Pharmaceutical Research (TIPR
This project primarily includes weak current engineering for the technological industrialization demonstration base, weak current engineering for Phase I project of the national key laboratory and scientific research achievement industrial base, and the computer room management system engineering. The building area spans 51,067 square meters. We were recognized as an “excellent constructor” by this client’s evaluation committee.
COFCO Coca-Cola Plant Renovation Project
This project is located in Binhai New Area of Tianjin. We have been a long-term service provider for COFCO Coca-Cola’s decoration, electromechanical installation engineering, as well as the maintenance of various types of equipment within the plant area.